Bessemer WoodTek Vinyl Privacy Screen Kit (2 Panels)
EC18027 Bessemer Privacy Screen

Bessemer Privacy Screen Kit

EC18027 SVG Cover Image

EC18027

Approximate assembly time for 90 min

Click here to watch an installation video.

Introduction

General Information

Important Safety Notes:

  • Check the inside of the larger pieces in your box for other materials packed inside.
  • When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching.
  • We recommend an area approximately 5’x 8’ for unobstructed assembling.
  • You should not need to use excessive force when assembling components.

Returns:
If you wish to return your product, please contact us first — we can often help resolve the issue right away.
If a return is still necessary, it must be initiated with the retailer where the product was purchased.

Need Help or Replacement Parts?

Although great care has been taken to ensure proper packaging and handling of this product, occasional issues can occur.

If you need replacement parts, assembly assistance, or have questions about the product, our customer service team is ready to help:

Customer service agents are available 9am–5pm EST, Monday–Friday.

For Quick Assistance:

  • Have reference item number EC18027
  • Provide the specific part name
  • Include the batch lot number found on the end of the box

Product Specifications

Detailed Dimensions & Specifications

EC18027 SVG Specs

Product Specifications:

  • Panel height: 48in
  • Panel width: 40in
  • Space between slats: ½ in
  • Depth in Ground of Anchor: 12in

Lay Out Materials

A — Left Post (2)

Left Post (part A) SVG

⅞" x 2" x 48"

B — Right Post (2)

Right Post (part B) SVG

⅞" x 2" x 48"

C — Post Anchor (4)

Post Anchor (part C) SVG

¾" x 1¼" x 15"

D — Rail (4)

Rail (part D) SVG

⅝" x 1" x 39⅞"

E — Board (8)

Board (part E) SVG

⅜" x 10" x 39⅞"

F — Joiner Clip (2)

Joiner Clip (part F) SVG

G — ¾" Self-Drilling Stainless Steel Screw (20)

3/4" Screw (part G) SVG

H — 1½" Self-Drilling Stainless Steel Screw (8)

1 1/2" Screw (part H) SVG

Check inside of rails for post anchors when unboxing.

EC18027 Packaging Detail

Step 1

Step 1 - Slide rail (D) into right post (B) SVG

  • Insert (1) Rail (D) into Right Post (B) in the top routed hole.
  • Assemble on box or other smooth surface to prevent scratching.

Step 2

Step 2 - Attach 1 board (E) into right post (B) SVG

  • Insert (1) Board (E) into the Right Post (B) at the top.

Step 3

Step 3 - Attach 3 boards (E) into right post (B) SVG

  • Continue inserting the remaining (3) Boards (E) into the other slots on the Right Post (B).

Step 4

Step 4 Insert Rail (D) into Right Post (B) at the bottom SVG

  • Insert (1) Rail (D) into the Right Post (B) in the bottom routed hole.

Step 5

Step 5 - Attach left post (A) set post against wall SVG

  • Attach Left Post (A) to the panel.
  • Ensure pre-drilled holes for the left and right post align.
  • For an easier assembly, use a wall as support for the right post.

Step 6

Step 6 - Insert 8 screws (G) into pre-drilled holes SVG

  • Insert (8) ¾" Self-Drilling Stainless Steel Screws (G) into the pre-drilled holes on posts.

Step 7

Step 7 - Slide post anchors (C) into bottoms of posts SVG

  • Insert (2) Post Anchors (C) into the bottoms of the posts.

Step 8

Step 8 - Insert 4 screws (H) in post to secure anchors SVG

  • Insert (4) 1½" Self-Drilling Stainless Steel Screws (H) into the posts to secure the Post Anchors (C).

Step 9

Step 9 - Repeat Steps 1-8 to assemble the other panel SVG

  • Repeat Steps 1-8 to assemble the other panel.

Step 10

Step 10 - Push assembled unit into the ground SVG

  • Attempt to push the unit into the ground.
  • Your screen panels can be rotated to hide the screws from one side.

Step 11

Step 11 - All 12" of post anchors must be fully inserted SVG

  • All 12" of Post Anchors (C) must be fully inserted.

Step 12

Step 12 Hammer and switch posts every few taps SVG

  • Hammer and switch posts every few taps.
  • If using a hammer, make sure that you use a block of wood as to not damage the tops of the posts.

For Hard Ground: Soften soil with the claw side of a hammer and water, or use a cordless drill with a 1.5" diameter tulip auger.

For Harder Ground:

  • Dig a hole large enough to accommodate one post from each panel (approximately 8" in diameter and 12" deep.)
  • Backfill and compact the dirt.

For Harder ground - dig hole SVG

Step 13

90° Degree Angle

Step 13 Connect panels with joiner clips (F) and screws SVG

180° Degree Angle

Step 13.A - 180 degree install SVG

  • Connect the 2 panels using (2) Joiners Clips (F) and (4) ¾" Self-Drilling Stainless Steel Screws (G).
  • Units can be installed at a 90 degree or 180 degree layout (depending on your preferred install.)

Need Help?

We Are Part of
Site Logo
Visit Our Websites
Privacy Notice ©2024-Nych Brands Inc. or its affiliates